AUTOMATION / RETROFIT: Rebuilding a Jestädt-machining center
to increase the turnout and to enhance the technical disposability.
![projekt04](https://www.henselundblank.de/wp-content/uploads/2016/04/projekt04.png)
![L1030562](https://www.henselundblank.de/wp-content/uploads/2016/04/L1030562-e1460532027989-201x300.jpg)
![L1030587OK](https://www.henselundblank.de/wp-content/uploads/2016/04/L1030587OK-e1460532089324-201x300.jpg)
![L1030587OK](https://www.henselundblank.de/wp-content/uploads/2016/04/L1030665-e1479295274774.jpg)
![L1030673a](https://www.henselundblank.de/wp-content/uploads/2016/04/L1030673a-300x192.jpg)
- Increasing the output
- Enhancing the technical availability
REALIZATION:
- Modifying the three cycle time determining stations with new engines and controls
- Increasing the ouput from 13 to 18,5 parts per minute
- Fashioning the cutting point betweeen SIMATIC S5 and S7 turned out as challenging (but got finally solved successfully)